Questions
By surface area and by the amount of preparation the surfaces need, which is the part that varies most between two houses that look similar. A wall that needs washing, filling, sanding and priming is several times the work of one that needs a coat. You get the scope in writing — surfaces, products, number of coats — so you can compare quotes on the same basis rather than on a single number.
Interior work runs all year, and January through March is the easiest time of year to book. Exterior work is weather dependent and needs surface temperature and dryness within range, so it runs roughly April through October in Lake County. We would rather tell you to wait for spring than put a coat on in November that fails by summer.
A single room is usually a day or two. A whole-house interior runs one to two weeks depending on how much trim and how much prep. A full exterior is typically one to two weeks, and the weather decides more than the crew does. You get a schedule up front, and you are told when it moves.
No. Interior work is done room by room so the house stays livable, and each room is put back at the end of each day rather than at the end of the job. If a kitchen is being refinished you will lose the use of the cabinets for a few days, and we plan that with you rather than around you.
Washing, scraping back failing paint, filling and sanding, spot-priming bare substrate, caulking joints, and masking and covering everything that is not being painted. Prep is not a line item to be trimmed to win a quote — it is the part that decides whether the finish lasts. If a quote you are comparing is much cheaper, this is usually where the difference is.
Two finish coats over a properly prepared and primed surface is standard. A dramatic colour change, a deep colour, or bare substrate may need a primer plus two, and if that is what your job needs it will say so in the written scope rather than appearing as a surprise later.
Professional-grade product from the major manufacturers, matched to the substrate — exterior and interior lines are not interchangeable, and cabinets and trim need harder finishes than walls. The specific products are named in your scope. If you have a preference or an existing colour already on file, we will work to it.
We will talk through sheen, undertone and how a colour behaves in a specific room's light, which is where most colour regret comes from. For a whole-house scheme on a larger property, a designer is worth the money and we work alongside one regularly.
Houses built before 1978 may contain lead-based paint, and disturbing it has to be handled under lead-safe work practices. Across the older housing in Waukegan, Libertyville, Highland Park and Lake Forest this comes up regularly. It is discussed before work starts, not discovered mid-job.
Usually three to five days. Doors and drawer fronts come off and are sprayed away from the house, while the boxes are prepped and finished in place. You keep the use of the cabinet interiors for most of that; the doors go back at the end.
Roughly April through October, and it varies with the spring. What matters is surface temperature and dryness rather than the date. Booking in winter for a spring slot gets you the dry early window, which is the best of the year for adhesion and curing.
Every two to three years in this climate, sooner on a deck with full sun exposure. Freeze-thaw cycling is hard on horizontal surfaces. Catching it before the old coating fails completely keeps it a re-coat rather than a strip.
Yes. Evenings, overnights and weekends are normal on commercial work, and for occupied spaces there are low-odour products that recoat fast enough to turn a room around overnight.
Service area
Text a photo of the room or the elevation and we will scope it, or call and we will walk it through with you.
Text a photo of the room or the elevation and we will scope it. Fastest way to a number.
Text a photoCall (224) 944-8652